Progress since last update:

A1
  • Discussed the split up of the work for the final report
  • Cam helped finish the skeleton for the games
  • Split up the work for the presentation
  • Tested our level with Paul

A2
  • Did the audio voice overs again to increase the volume
  • Touched up the graphics for the level
  • Met and made a meeting time to do the final report
  • Completed job interview skills level and polished up main application graphics

A3
  • Finished drawing all 7 sprites
  • Thomas' file crashed, but managed to finish the program
  • Jordan looked at sounds for level 4
  • Worked on presentation: divided the work

A4
  • Title page reworked to match standard
  • Improvements other graphics too.
  • Edited facial expressions photographs
  • Divided work for final report
  • Discussed about design manual and distributed work.

A5
  • Kevin N, together with Jerry Yang (from Team A7) worked on completing the game level of Appropriate conversation training
  • Kevin N finalized the making of the level before handing it to Paul Coyle
  • Formatted the questions
  • Error and glitch fixing for the game
  • Did testing of audio files and their quality and did editing with audacity
  • Made how to play screen and did the animation for the tutorial.
  • Edited targets graphics and also changed background of the game and changed colours and buttons

A6
  • Organized the remainder of the content to be done in the project.
  • Delegated tasks regarding the final poster and the manual.
  • Ben and Jose continued to work on the programming with difficulties due to computer problems.
  • Divided up the remainder of the final report and collected money from the lab to print the poster.
  • Completed graphics this week including all pictures, audio and video which were sent to the programmers.
  • Designed the poster to present at the open house.

A7
  • Alex: design the intro for the conversation game and also designed a tank to be used in the game
  • Jerry: programed and compiled the components for the conversation game
  • Noah designed the back ground of the game for A3

Figure 1: Project Progress Chart


To be accomplished during the next week:

A1
  • Cam putting in all content into the games
  • Al will be working on testing the levels
  • Abdel will be working on the design manual for the presentation
  • Putting all finishing touches to the project / getting it ready

A2
  • Testing the software
  • Work on the poster / operation manual
  • Complete the final report
  • Integrate levels into full application
  • Build final deployable application with copy of Zinc generously gifted to the lab by MDM Ltd.

A3
  • Completely finish the game
  • Add color to sprites
  • Improve background graphics
  • Find all sounds for music
  • Successfully compile the program
  • Get 5 screenshots

A4
  • Finish a complete test of our product.
  • Refine the product prior to open house

A5
  • Fix up anything in the game if necessary.
  • Karim is working on "estimated game play time" for the instructor manual
  • Rob is working on "overview" of the instructor manual
  • Canaan is going to take screen shots of the game for the poster and have captions
  • Kevin is going to help update us of his testing this following week so we can help him write up that section on the final report
  • Group meeting on monday to discuss final report!
  • This weekend need to figure out what we are including for final requirements and testing and how to organize them

A6
  • Finish the final report, the poster, the game and the manual
  • Open house presentation
  • Finish our portfolios
  • Wrap up our logbooks.

A7
  • Final report
  • Work on the poster and the game manual if assgined