Completed:
During the last week of classes there were many areas that needed to be completed in ENGG 253. Everyone as a lab focused on lab cohesion testing, making sure all the games were together, and making all the music synchronized, and that all the scores were being passed on. Also a lot of hours went in to focusing on specific bugs in relation to specific, individual games. Another portion of our time went into fixing any problems with the transitions.
In preparation for the open house, many things had to be done. Work on the poster was started and completed. Also the design manual which told the user how to play our game was finished and each game had a description of it. The DVD’s were also made, which had our labs game on it.
After the poster had been made, and the game was completed it was time to officially be prepared for the open house. The presentation was written and practiced so that the open house would go smoothly. After everything was completed, the open house was done, and went very well.

No comments:
Post a Comment