Friday, April 9, 2010

BLACK C Status Report for the Week of April 5th, 2010:

General Accomplishments

Accomplished this week:

  1. PM committee set up a poster committee . Each group was instructed to forward their components to the poster committee, and they would combine their efforts in producing and publishing data graphics for the lab poster assignment.
  2. All graphics, and score boxes used in each .gmk file were standardized and all duplications were either deleted or replaced.
  3. Every group finished their component of the game maker file by the 9th April. The final compilation (using .bat data script) will be performed on 13th April, 2010.
  4. Set up the design manual committee and delivered draft manual formatting expectations and internal deadline.

To be Accomplished next week:
  1. Receive final design manual draft from the design manual committee on 13th April, 2010 and print it.
  2. Receive poster from the poster committee.
  3. Prepare five minute oral presentation and rehearse on the 14th April, 2010.
  4. Present the final game product “ Supercow’s Adventures” to the Mustard Seed and other guests during the open house on the 15th April, 2010.


Figure 1.0: Project Status Gantt Chart

C1

Accomplished this week:
  1. This week, our lab table completed both level one and level two of our game.
  2. Following this, we performed the intermediate testing of our program. This included playing the game and recording all engineering requirements which were not met. Once this information was recorded we were able to create charts that displayed the testing information.
  3. The programmers then utilized this testing information to alter the program and make sure it met the engineering requirements. The final report was started and is almost complete.
To be accomplished next week:
  1. We still have yet to complete the final testing of the program. The Final Report is almost complete, we just need to include the final testing results once the testing is carried out and finish everything up.
  2. We also have to complete this group’s portion of the design manual and email it to Monika. This will then be edited by her and passed onto Amie, who will then email it to Joe.
  3. The lab also needs to complete the poster for the open house. Another important task is to integrate and connect all the games within the lab.

C2
Accomplished this week:
  • Obtained test data and results for phase one of the game software. Tested for reaction time and incorporated software reaction time immunity in phase one of the game design.
  • Two meetings were held to discuss more test parameters and design test procedures to evaluate functional performance in phase two of the game.
  • Added and developed a graphical user interface (GUI) that would be used throughout our game component and possibly be carried over to the entire lab.
  • Drafted design manual component expectations on 7th April, 2010.
  • Drafted final report expectations and further refined task breakdown and deadlines on the 9th April, 2010.
  • Designed sequencing order for playing executable files for the entire lab section.
To be accomplished next week:
  1. Implement game sequence according to the designed sequencing order on 13th April, 2010.
  2. Forward game component screenshots to the poster committee on 13th April, 2010.
  3. Print all source codes and append to our final report.
  4. Proofread and edit final report by 14th April, 2010. Print and submit final report on the 15th April, 2010.
C3
Accomplished this week:
  1. Finished finding all the sprites
  2. Converted all the sprites to objects
  3. Wrote all four levels of the game
  4. Tested individual levels
  5. Started writing the final report
  6. Tried to put the two aisles in the game together
To be accomplished next week:
  1. Finish final report
  2. Test the whole game together
  3. Final touch ups on the game
  4. Poster evaluation
C4
Accomplished this week:

  1. Finished all the objects for the game
  2. Used a condition statement to drop object
  3. Added a variable to control the maximum speed of the super cow
  4. Changed the score system
To be Accomplished Next Week:
  1. Finish the programming for the game
  2. Finish the poster
  3. Start the final report
  4. Prepare for the open house
  5. Work on design manual

C5
Accomplished this week:
  1. Finished our program along with all necessary documentation of testing
  2. Finalized roles for the open house and the final report
  3. Designated a team within the lab to complete the poster for the open house, consists of 5 people, set deadlines for poster
  4. Designated 3 people to do the final editing for the design manual, set deadlines for design manual

To be Accomplished Next Week:
  1. Have all appropriate documents sent to editors by deadline
  2. Complete final report by Thursday
  3. Have design manual for our table ready to be sent to first editor by Sunday
  4. Have all poster information given to poster committee by deadline.

C6
Accomplished this week:

  1. Finished program as per schedule. Minor game format discrepancies were resolved with the consideration of the programming committee.
  2. Tested program to identify any run-time bugs or errors. The test results were analyzed and later compiled to enhance performance.
  3. Began drafting the design manual component of our group and refined report objectives and expectations
  4. Chose game frames (screenshots) that would be forwarded to the poster committee for publishing.
To be Accomplished Next Week:
  1. Commence final testing phase of the project and further analyze performance of the software component.
  2. Compile, and proofread final report by the end of next week.
  3. Finalize the design manual report.
  4. Prepare for the oral presentation and rehearse with other presenters on Tuesday April, 14th, 2010.
C7
Accomplished this week:
  1. Dissected the Tetris code that was found on line so that we could use parts of it in our game.
  2. Made the sprites for the Tetris game.
  3. Found background image for the Tetris game.
  4. Finished programming the Tetris game.
  5. Tested the Tetris game.
  6. Fixed bugs in the Tetris game.
  7. One member of group is on poster committee.
To be accomplished next week:
  1. Finish our section of the instruction manual
  2. Finish Final Report